Concrete pump pumping main points
Publisher:admin  Time:2014/4/7 8:39:17  Click:2263

Concrete pump pumping main points

Source: Author: Date: 2013-08-20 Views: 192 Comments: 0 Favorite Print

Abstract: Concrete pump

  (1) concrete pumpability. Concrete pump pumping requirements can be satisfied, when necessary, to determine the mix of pumping concrete pumping through trial.

    ① maximum ratio of coarse aggregate size and caliber of delivery should be: When pumping height 50m or less, not more than one for gravel: 3, for not more than a pebble: 2.5; pumping height at 50 ~ 100m time , should be 1: 3 to 1: 4 range; pumping height of 100m above, should be 1: 4 to 1: 5 between. Flakiness particle content of not more than 10%.

    ② different pumping height, the pump may slump concrete (Table) selection.

     Pumping height (m) 30 or less than 30 ~ 60 60 ~ 100 100

     Slump (m) 100 ~ 140 140 ~ 160 160 ~ 180 180 ~ 200

    ③ suitable for pumping concrete water-cement ratio (0.4 to 0.6): 1.

    ④ sand pumping concrete should rate was 38% to 45%. Fine aggregate should be adopted in the sand, the amount of sand sieve through 0.315m not less than 15%.

    ⑤ Pumpcrete minimum cement content of 300kg / m3.

(2) concrete pump should start pumping after an appropriate amount of water to wet the concrete pump hopper, concrete cylinder and the feed pipe in direct contact with the concrete site. Pumping water and then using one of these methods lubricate these parts: pumping grout; pumping 1: 2 cement mortar; pumping in addition to other components outside the coarse aggregate ratio of cement mortar.

    Lubricated with grout or cement mortar should be decentralized fabric, not concentrated in the same place pouring.

(3) at the start of pumping, concrete pumps should be in a slow, constant speed running state, and then gradually accelerate. And should observe the work pressure of concrete pumps and systems, and the systems to be able to work behind the normal speed pumping.

(4) work as continuous pumping concrete, concrete cylinder piston stroke should be kept to a maximum run to maximize the performance of concrete pumps and concrete cylinders can wear the uniform in the longitudinal direction.

(5) If there is high pressure concrete pump and unstable temperature rise. When vibration and pumping duct obvious difficulties phenomenon, can not be forcibly pumping, should be excluded immediately identify the cause. Can be obtained with a mallet percussion duct elbow. Conical tubes and other parts, and slow or reverse pumping pumps to prevent clogging.

(6) When a blockage occurs, it should take the following measures:

    ① repeated anti-pump and pump are running, gradually returned to suck out the concrete hopper, by mixing and re-pumped.

    ② with a mallet percussion and other methods to identify the blockage site of repeated anti-pump and pump run until after being hit loose concrete to eliminate clogging.

    ③ When the above two methods are ineffective, should be disassembled after the concrete relief blockage site, re-pumping to be discharged after the blockage.

(7) should be used to pump concrete ready-mix concrete, can also be set up at the scene stirred Station Supply pumping concrete, but not pumping hand mixing concrete. Concrete supply should be strictly controlled, and pay attention to changes in the slump, do not meet the requirements of the concrete pumping is not allowed into the pump, in order to ensure the effective work of the concrete pump.

(8) should be set on a concrete pump hopper screen, and let someone feed monitoring to avoid excessive aggregate diameter or foreign objects entering and causing blockage.

(9) When pumping, the stock of the concrete inside the hopper can not be lower than the position of the agitator shaft to prevent air from entering the pump tube caused by pipeline vibration.

(10) when the concrete pumping process requires terminal interrupt time should not exceed 1h. And should be every 5 ~ 10min anti pumps and pump operation are to prevent the pipeline due to bleeding or concrete slump loss is too large and blocked tubes.

(11) After pumping is completed, must be carefully cleaned hopper and pipeline systems. Residual concrete concrete cylinder if removal is not clean, will solidify on the cylinder wall when the piston is running again, the piston sealing surface will have a direct impact on the cylinder wall to withstand the concrete has cured them, causing the piston to push the local spalling. This damage is different from the normal wear of the piston seals, sealing surface can not be self-compensated under pressure, resulting in leakage of plasma or suck air, causing pumping weakness, blockage.

(12) when the concrete can be poor or the concrete pump bleeding, segregation and difficult to pump, should immediately mix, research concrete pumps, piping and pumping process, etc., and take appropriate measures to resolve.

Pre:Concrete pump master cylinder unable commutation Causes
Next:Concrete pumping Notes
    
 
日批出水视频精品 | eeussm中文字幕国产精品 | 欧美成人乱码一区二区三区 | 日本全黄免费一级 | 潘金莲4级婬片AAAA | 欧美操比比视频免费下载 | 欧美精品欧美极品欧美激情 | 又黄又爽又色又湿又少的视频 | 无码国产精品一区二区免费16 | 秀秀视频在线观看免费 | 91无码精品国产 | 亚洲 无码 久久 | 久久久久久国产成人a亚洲精品无码 | 老司机午夜精品A片A毛 | 国产99久久久久久久久 | 中文字幕精品久久久久人妻红杏1 | 成人做爱黄色视频在线观看网站 | 欧美无砖砖区免费又粗 | AV啊啊啊精品高肉 | 99久久精品国产一区二区野战 | 25cb.com| www.99re| 少妇被又大又粗猛烈进出视频 | 午夜dV一区二区 | 一级婬片试看3O分钟 | 国产精品久久久爽爽爽麻豆色哟哟 | 嫩草研究院欧美性爱 | 国产69tv精品久久久久视频 | 黄色视屏在线观看 | 一级黃色真人毛片 | 免费一级婬片AA片观看露露 | 精产国品少妇在线视频 | 国产精品成人一区BBαV | jlzzjlzzjlzz曰本人 | 黄色视频网站一区二区 | 极品97尤物被啪到呻吟喷水 | 2024国产一区二区三区在线观看 | 欧美一区二区三区五月天婷婷 | 厨房free性hd猛性BBW厨房 | 久久蜜桃香蕉精品一区二区三区 | 亚洲国产精品无码观看久久 |